The whole job. Up to spec.

Find what’s missed.
Before it is.

Russell is a construction subject matter expert who knows your project — start to finish, office to field. The daily walk, the submittal, the RFI, the call the PM has to make. He answers from your contract documents and cites the paragraph. Not an opinion. The record.

Transmittal No.
28 31 76-04-01
SD-03 · Product Data
Fire Alarm
Manufacturer's catalog data — control panel
PARA 2.1.1
SD-03
UL listing — initiating devices
PARA 2.2.4
SD-03
Battery calculations
PARA 2.4.2
SD-03
REQUIRED — NOT PROVIDED. ADD TO THE PACKAGE AND RESUBMIT COMPLETE.
Installer qualifications — NICET II
PARA 1.4.1
SD-01
Revise & resubmit
QC-0 → QC-7Rev 0
Actual output format. Your logo, not ours.
21Days, typical federal review turn
What one missing item costs

Miss one certificate and the package comes back. Then it goes back out, and waits in line again. One overlooked paragraph can cost you the better part of a month — on work that was ready to start. Commercial work? The letterhead changes. The wait doesn't.

Review periods are set by your contract, not by us. Twenty-one days is what federal turns typically run in the field.

Why we built it

Field teams have been waiting for this. Nobody had built it — so we did.

Everybody makes mistakes. On a job, they cost money and schedule. Russell reviews everything against the record and catches what a tired human at 9 PM misses — before it ships, not after it costs you.

Who Russell is

A construction subject matter expert, on every job, every day.

Not a chatbot bolted onto a filing cabinet. Russell carries the project the way an experienced hand does — through precon, procurement, the field, and closeout, from the daily walk to the call a PM has to make on the phone.

On the walk

What is ready, what is blocked, what got installed before its submittal was approved. Talk it in from the deck and it lands in the record.

At the desk

Submittals, RFIs, deficiencies, the daily report. Drafted from the contract documents, cited to the paragraph, waiting for you to approve.

Across the job

Precon through closeout, one record. What the superintendent saw this morning is what the PM sees this afternoon — and what the reviewer sees at the end.

Why not just use ChatGPT

Why force a general AI and create workarounds? SPECUP's Russell already does it.

Your data stays yours

It stays in your project. No cross-company training without your consent. With SharePoint write-back, it never leaves your own tenant.

Answers from authority only

Russell answers from your approved contract documents and cites the paragraph. If it isn't in the record, he says so instead of guessing.

He's always learning

Every correction you make is the record. Russell gets sharper on your jobs, your trades, and your suppliers — week over week.

Already a Microsoft shop? Good. Russell does the construction work; Copilot can find it.

The closed loop

Subs hand you complete packages.

Six stages, front to back. We label what runs today and what's still coming — every line.

01

Plans against specs Now

Where a sheet points at a section, SPECUP compares them — fire ratings, gauges, types, board thicknesses — and checks both directions of reference. Every item quotes the sheet and the paragraph, side by side, and drafts the RFI. It reads the written blocks on a sheet: schedules, general notes, keynotes. It does not read geometry.

02

Subcontractor scopes Now

The scope for each sub, generated from the contract documents instead of last job's copy-paste.

03

Package requests Now

What each sub actually owes — by spec paragraph, by SD classification — issued to them as a request.

04

Sub submits directly Now

The sub opens SPECUP on their phone and the first thing on the screen is what they owe you — with the 7-day resubmittal clock running on anything you sent back. They upload the package and send it. No email chain.

05

Instant feedback Now

The moment they upload, SPECUP reads the package and tells them which required items it couldn't find — before it ever reaches your desk. It flags for review; it does not rule.

06

Complete, then routed Now

When a package lands you're told what actually arrived: complete, short by a named count, or not verified because nobody could read it. A scan that can't be read is never called complete.

We label everything. If a feature isn't built, it says Roadmap. You will never find out on your job that something we sold you doesn't exist.
Before any of it works

Ask twice, get the same answer.

Most of what goes wrong with AI on a jobsite happens before the answer: the documents weren't really read, or they get re-read differently every time you ask. Both are fixed at the front door.

Read once

At the door, not at the question

Your specs get broken into their own paragraphs the moment they arrive — 2.1.B stays 2.1.B. Every answer later cites a paragraph you can find in a paper copy, not a floating chunk of a page.

Same answer

Tuesday and Thursday agree

Ask the same question twice and you get the same answer back, marked as the answer of record, with the date it was first given. Told 5/8″ on Tuesday and 1/2″ on Thursday is how a wall gets torn out.

But not stale

A change kills the record

New revision, an ASI, an RFI landing on that section — the recorded answer dies and it's worked again from scratch, and it tells you which of those happened. Consistency that outlives the documents is worse than none.

Scans

A copy of a copy still reads

Old sheets, marked-up prints, anything that went through a copier has no text in it at all. Those get read off the image — and the words stay pinned to where they sit on the page, so you can still see the line.

Bad scans

Read twice, then reconciled

Schedules, two-column pages, small type on a reduced print — the pages a character reader gets wrong get read a second time a different way, and the two readings are checked against each other line by line.

The hard rule

Nothing gets added that isn't there

A line that can't be traced back to the scan is thrown out and counted. An invented schedule row reads perfectly, which is exactly why it can never be allowed to become a requirement.

RECEIVED what arrived, and when READ text, or off the image BROKEN OUT into numbered paragraphs INDEXED standards, ratings, sizes SHOWN TO YOU before you rely on it

Open any document and you can see exactly what came out of it — how it was read, how many paragraphs, how many carry a “shall,” and every line a second reader tried to add that didn't match the scan. A half-read spec book should never look the same as a fully read one.

Every answer

Trust, but verify. So we show you the page.

Russell doesn't ask you to take his word for it. Every answer carries the document behind it — the actual page, with the exact line highlighted.

See it

The actual page

Click through and you get the page as it was uploaded, with the referenced lines boxed. Not a summary. Not a quote he typed. The page.

Drawings

A snippet of the sheet

A 30×42 sheet on a phone is a grey rectangle. So a drawing comes back cropped to the area in question and enlarged, with the whole sheet one tap away.

Scaling

He tells you he scaled it

Scaled off a drawing, interpolated, assumed — it says so, shows how he got there, and drafts the RFI. Scaling is fine. Scaling quietly isn't.

Sign-off

A person, not a machine

Anything he worked out stays unvalidated until someone checks it and says what they checked. Your name and the time go on the record.

Missing

“Not in your documents” gets proved

He names the section that should have covered it and whether you've uploaded it. If a document is on the shelf but couldn't be read, that isn't not there — it's we can't tell, and he says that instead.

Outside

Off-contract answers get labelled

Ask him a general question and he'll answer — marked as coming from outside your contract, and whether he looked it up or already knew it. The spec still governs.

CITED backed by your documents DERIVED he worked it out · needs a human OUTSIDE not your contract NOT ON FILE and here's where it should be

Every answer is recorded — the question, what backed it, who signed it off. If a reviewer ever asks how you knew, the answer is a document, not a memory.

Division 01 · Submittal management

No review ends at a recommendation.

Every review produces an assembled, review-ready package — put together the way the reviewer expects to receive it. That's the whole point. Load the full plans and specs, or drop in a single submittal with its spec section — same review either way.

Register

Built from the specs

The Master Submittal Register generates itself from your specifications — transmittal number, SD classification, paragraph, ball in court.

Cover sheets

One per required item

Every required item gets a cover sheet ahead of its documentation. Missing items get one too, flagged in place at the right register position.

Deficiencies

A list the sub can act on

Requirement, paragraph reference, what's wrong. Seven calendar days to resubmit complete. Partial resubmittals aren't accepted.

No slip sheeting

Complete package, every time

No fragment swaps. No partial replacement. Every revision produces a full new version, so the record never goes ambiguous.

Their forms

Their forms, not ours

Your transmittal comes out on ENG 4025 and your register on ENG 4288 — the actual current editions, as real PDFs. Download and attach. Not our format. Theirs.

Your format

Your logo, or your own form

Nothing we make carries our branding into a deliverable you send. And if your company already has a daily report or a form it likes — upload it, mark the spots to fill, confirm what each field is, and SpecUp fills it from the project record. Your fonts, your letterhead, your logo. We put the values in; we don't rebuild your document.

QC-0 Template integrity QC-1 Completeness QC-2 Specification QC-3 Drawings QC-4 Register QC-4A 30-second findability QC-5 Assembly QC-6 Final audit QC-7 Release authorized

Status: submittal review, package assembly, the federal transmittal forms (ENG 4025 / ENG 4288) and the plan-against-spec check all run in the app today Now · in-app. Standing up a full project — loading a contract's specs and drawings and building the register with you — still runs as a managed service Now · service.

One product, your door

Pick the division that hurts most.

Born on federal jobs — the hardest compliance in construction. If it holds up to a federal reviewer, your commercial and residential work is the easy day. Turn on what you need; upgrades are a switch, not an implementation.

Precon

Bid Room

Bid leveling, inclusions and exclusions, clarification requests, award straight into a live project.

Quality

Submittals & QC

Register, review, three-phase inspections, deficiencies that close the loop.

Field

Phone-first, offline

Talk it in. Punch from a photo. Daily CQC report that assembles itself. No signal required.

Walks

Super & QC walks

Start a walk; everything you capture attaches on its own. Hand each trade their own list at the end.

Changes

Change items & rework

The contract on one side, what's actually there on the other, dated the day you saw it. We never price it.

Office

Answer Desk

Project inbox, triaged. The answer drafted from the record, cited — you approve and it sends.

Subs

Flow-down

What each sub owes, what's late, what's outstanding — surfaced before it's a problem.

Supply

Supply Line & receiving

Deliveries checked against approved submittals. Existence is not compliance.

Start

Field suite on day one.

Add

Turn on the submittal engine when the federal job lands.

Keep

Same data. Nothing to migrate.

Pricing

Published at beta close. Ask and we'll talk straight.

Who built it
Veteran-Owned
  • Built from the field: QC Managers, Superintendents, Project Managers
  • Working federal construction — today
  • Design led by Corps of Engineers reporting discipline
  • PMP
  • Last Planner · Lean
  • Offline-first by design
  • Microsoft 365 · GCC High-ready
  • SpecUp, LLC · Arizona

I didn't set out to build software. I set out to stop losing weeks to packages that came back over one missing certificate.

I've worn the hats this tool serves. I've also taught those positions how to use project management software. The information is there and the tools are there — but the flow and the integration were never built for actual field operations. Not for the questions that get asked in the field and need an answer right now. Not for the stop-and-go reporting you get when the day keeps interrupting you.

This got built owning those roles and working in the trenches with QC managers, superintendents and project managers — on federal, commercial and residential work. The design was led by the rigor the U.S. Army Corps of Engineers demands — how work gets reported, filed and logged. What the field needs is consistency, and it needs the answers right now.

I know what a reviewer looks for, what a rejection costs, and how much of a super's week disappears into paperwork that a machine should have handled. So I built the tool I wanted on my own jobs, and I test every piece of it on real work before anyone else sees it.

SPECUP isn't an AI wearing a hard hat. It's the record — what your contract says, and what got decided against it. It knows what a submittal is, what a spec paragraph means, and why a complete package matters. If it doesn't know something, it tells you — that rule doesn't bend.

Founder
SpecUp, LLC · Arizona
Who this is for

Same engine. Different job.

The rigor came from federal work. The daily work of running a job is the same everywhere.

Closed beta

Find out what your paperwork actually costs.

Two minutes, your own numbers, no email required. If Russell already handles something you're paying people to do, you'll see it on the same screen.