SPECUP runs the mechanical check — every required item, every spec paragraph, QC-0 through QC-7. SpecUp checks every required item automatically. Your QC Manager makes the final review and signs before it's submitted.
One required item against one spec section. Cover sheet, QC-0 → QC-7, released or flagged.
Cover sheets for every item, deficiency list if anything's short, complete assembled package either way.
Shop drawings, coordinated-system submittals, or a package that crosses several sections of the spec.
Resubmittal after a deficiency list: 50% of the original tier. Partial resubmittals aren't accepted — see the no-slip-sheet policy above.
Master Submittal Register generated from your specs, project baseline set, plan/spec contradiction check run before the first package moves.
Small programs start near $2,500/mo; a full multi-trade program runs $4,500–$7,500+/mo depending on submittal volume and review load.
Several active contracts, dedicated review capacity, direct coordination on cadence and turnaround.
Rates reflect the beta program and may adjust at general availability. Every package — Quick Review or Full Project — gets the same QC-0 through QC-7 gate and your QC Manager's sign-off before it ships.